I have an estimate with 8 different line items, but 2 of the line items are for the the same type of job which is retainer walls.
On the estimating portion I have:
- Vegetable Box Retainer Wall
- Retainer Wall
When I go into work tickets only Vegetable Box Retainer Wall shows up. I need to record materials into the Retainer Wall work ticket, but it is not appearing. What should I do?
